Case Study

The Challenge

A 24-hour dairy processing plant in the Phoenix metro area was losing nearly half its workforce every cycle.

The facility operated around the clock with a two-shift, 12-hour model. Workers were burning out, calling off, and leaving within weeks. Retention sat below 50%, and the constant churn created safety risks, training bottlenecks, and production slowdowns. Management had tried wage bumps and hiring surges, but neither addressed the root cause: shift fatigue.

What the employer was dealing with:

  • Retention under 50% with no improvement trend
  • 12-hour shifts causing burnout and high absenteeism
  • Constant rehiring and retraining draining supervisor time
  • Safety incidents increasing with fatigued and undertrained staff
  • Production targets missed due to unstable crew counts

Approach

TPM's Solution: Shift Redesign + Staggered Onboarding

Working from our Peoria office, TPM analyzed the root cause of turnover and recommended a structural change to how shifts were organized.

1

Shift Structure Analysis

TPM reviewed attendance data, exit feedback, and shift patterns. The 12-hour model was identified as the primary driver of burnout—not pay, not management, not the work itself.

2

3-Shift, 8-Hour Redesign

TPM proposed transitioning to three 8-hour shifts. This reduced physical fatigue, gave workers more predictable schedules, and opened new hiring windows for candidates who couldn't commit to 12-hour blocks.

3

Staggered Onboarding

Instead of onboarding large groups at once, TPM introduced staggered start dates. This gave supervisors time to train each cohort properly and reduced first-week overwhelm—a key dropout trigger.

4

Ongoing Monitoring

TPM tracked attendance, retention rates, and supervisor feedback weekly to confirm the new model was holding and make adjustments as needed.

Outcomes

The Results

The shift redesign produced measurable improvement at this Arizona facility within weeks—not months.

85% Retention Rate (up from <50%)
<30 Days Time to Results
3 Shifts 8-Hour Rotations
24/7 Continuous Coverage Maintained

Takeaways

What Employers Can Learn

Shift Length Drives Retention

Long shifts don't always mean more output. In physically demanding environments, shorter shifts reduce fatigue and keep people showing up.

Onboarding Pace Matters

Flooding the floor with new hires creates chaos. Staggered onboarding gives supervisors capacity to train properly and reduces early dropout.

Diagnose Before You Hire

More hiring doesn't fix a structural problem. Identifying the root cause of turnover first saves time, money, and frustration.

Employer Feedback

What Employers Say

★★★★★

"Total Presence Management was instrumental in coordinating interviews, managing the offer process, and supporting our ongoing hiring needs. Their communication, responsiveness, and ability to deliver qualified candidates made the process efficient and seamless."

W.L. Gore Medical Manufacturing
★★★★★

"Total Presence Management was flexible, responsive, and understanding of our evolving needs. Their willingness to move quickly and provide support made them a trusted partner we would confidently work with again."

Martinic Engineering Manufacturing
★★★★★

"The candidate placed by Total Presence Management has been performing exceptionally well and quickly integrated into our team. We have been very pleased with the quality of the placement and the results so far."

The Foster Alliance Candidate Performance Feedback

FAQ

Employer
FAQs

No. This case study highlights a specific engagement, but TPM supports employers across many industries including admin, healthcare, accounting, and professional services. The shift redesign methodology applies wherever scheduling impacts retention. View industries we support.
Yes. Through HR Consulting, TPM can analyze your current scheduling model and recommend changes that improve retention and reduce burnout. Call (623) 215-3425 to discuss your situation.
In this engagement, measurable retention improvement happened within 30 days. Timelines vary based on your operation, but structural changes like shift redesign tend to show results quickly because they address the root cause of turnover.
TPM offers direct staffing support too. But if you're seeing high turnover, adding more workers without addressing the cause often leads to the same cycle. We'll recommend the right approach for your situation.
Call our Peoria office at (623) 215-3425 or request employer support online. Share your roles, headcount, and current challenges, and we'll recommend the best next step.
Trusted Across Arizona

Trusted by Arizona Businesses Since 1996

Super Bowl partner Military partner Coca-Cola partner City of Phoenix partner ADOT partner Amazon partner Super Bowl partner Military partner Coca-Cola partner City of Phoenix partner ADOT partner Amazon partner

Talk with a Local Arizona Team

No phone trees—just real human support from our nearby Peoria office.

Services for Employers

MSP · VMS Admin · Staffing · HR Consulting · EOR & Payroll

Locations

Peoria · Phoenix · Glendale · Scottsdale · Sun City

 

Request Consultation

Share how we can help.

By submitting, you agree to our Privacy Policy and Terms of Service.